Triple

T4607001
Position Surface form Disambiguated ID Type / Status
Subject L Area E100461 entity
Predicate instanceOf P0 FINISHED
Object reactor and support complex C399 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: reactor and support complex
Context triple: [L Area, instanceOf, reactor and support complex]
  • A. part of building complex
    A part of building complex is a distinct physical or functional subdivision within a larger group of interconnected buildings, such as a wing, tower, or annex, that contributes to the overall use and structure of the complex.
  • B. building complex chosen
    A building complex is a group of interconnected or related structures on a shared site that function together as a unified facility or environment.
  • C. reactor safety research program
    A reactor safety research program is an organized, systematic effort to study, evaluate, and improve the safety, reliability, and risk management of nuclear reactors through experiments, modeling, and analysis.
  • D. graphite-moderated reactor
    A graphite-moderated reactor is a nuclear reactor that uses graphite as a neutron moderator to slow down fast neutrons, enabling sustained fission in fuel such as natural or low-enriched uranium.
  • E. dual-purpose reactor
    A dual-purpose reactor is a nuclear reactor designed to simultaneously produce electrical power and another output, such as process heat or weapons-grade materials.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43cce1e08190a07d53af6a9b6c24 completed March 20, 2026, 12:55 p.m.
Created at: March 20, 2026, 1:12 p.m.