Triple

T4603586
Position Surface form Disambiguated ID Type / Status
Subject Russia and China E100375 entity
Predicate infrastructureProjectsInclude P19374 FINISHED
Object cross-border bridges LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: cross-border bridges | Statement: [Russia and China, infrastructureProjectsInclude, cross-border bridges]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: infrastructureProjectsInclude
Context triple: [Russia and China, infrastructureProjectsInclude, cross-border bridges]
  • A. smartCityProjects
    Indicates a relationship where a city undertakes or is associated with projects that apply digital, data-driven, or intelligent technologies to improve urban services and infrastructure.
  • B. majorConstructionUnder
    Indicates that a location or structure is currently undergoing significant construction work or large-scale building activity.
  • C. notableRailwayProject
    Indicates that the subject is recognized for involvement in a significant or prominent railway-related project.
  • D. isPartOfInfrastructure chosen
    Indicates that something belongs to, is included within, or functions as a component of a larger infrastructure system.
  • E. infrastructureImpact
    Indicates the effect that an action, event, or entity has on the condition, performance, or availability of infrastructure systems.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43cbc014819098b45f435908f88a completed March 20, 2026, 12:55 p.m.
NER Named-entity recognition batch_69bd5975ec688190839bd22669343a76 completed March 20, 2026, 2:28 p.m.
PD Predicate disambiguation batch_69bd522c811c81909aae4feadae33174 completed March 20, 2026, 1:57 p.m.
Created at: March 20, 2026, 1:11 p.m.