Triple
T4598944
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Göta Canal and locks |
E100272
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | engineering landmark |
C3635
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: engineering landmark Context triple: [Göta Canal and locks, instanceOf, engineering landmark]
-
A.
civil engineering landmark
chosen
A civil engineering landmark is a significant structure or project—such as a bridge, dam, tunnel, or roadway—that exemplifies notable achievement, innovation, or historical importance in the field of civil engineering.
-
B.
urban landmark
An urban landmark is a prominent, easily recognizable feature within a city—such as a building, monument, or natural formation—that serves as a visual reference point and symbol of the area’s identity.
-
C.
commemorative structure
A commemorative structure is a built form, such as a monument or memorial, created to honor, remember, or mark a person, group, event, or idea of significance.
-
D.
historic infrastructure
Historic infrastructure comprises long-standing physical structures and systems—such as bridges, roads, canals, and railways—that were built in the past and continue to embody cultural, technological, and architectural significance.
-
E.
building
A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd43cbc014819098b45f435908f88a |
completed | March 20, 2026, 12:55 p.m. |
Created at: March 20, 2026, 1:11 p.m.