Triple

T4592874
Position Surface form Disambiguated ID Type / Status
Subject Lincoln County, Washington E103535 entity
Predicate roadNetworkFeature P3293 FINISHED
Object U.S. Route 2 E38850 NE FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 2 | Statement: [Lincoln County, Washington, roadNetworkFeature, U.S. Route 2]

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43dccaf08190aa89e9991a289719 completed March 20, 2026, 12:55 p.m.
NER Named-entity recognition batch_69bd593cf8508190acfc6ddb5716e80a completed March 20, 2026, 2:27 p.m.
NED1 Entity disambiguation (via context triple) batch_6a46295133648190aa2941eddcfed41e completed July 2, 2026, 9:03 a.m.
Created at: March 20, 2026, 1:11 p.m.