Triple

T4585281
Position Surface form Disambiguated ID Type / Status
Subject Foz do Iguaçu E101952 entity
Predicate hasAttraction P105 FINISHED
Object Itaipu Dam E98397 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Itaipu Dam | Statement: [Foz do Iguaçu, hasAttraction, Itaipu Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Itaipu Dam
Context triple: [Foz do Iguaçu, hasAttraction, Itaipu Dam]
  • A. Itaipu Dam chosen
    Itaipu Dam is a massive hydroelectric power plant on the Brazil–Paraguay border, once the world’s largest in installed capacity and still one of the most important sources of renewable energy in South America.
  • B. Yacyretá Dam
    The Yacyretá Dam is a large hydroelectric power plant on the border between Argentina and Paraguay that generates electricity by harnessing the flow of the Paraná River.
  • C. Salto Grande Dam
    Salto Grande Dam is a large hydroelectric dam and binational power station on the Uruguay River, jointly operated by Argentina and Uruguay.
  • D. Kariba Dam
    Kariba Dam is a massive hydroelectric dam on the Zambezi River between Zambia and Zimbabwe, forming one of the world’s largest man-made lakes and serving as a key source of power for the region.
  • E. Angostura Dam
    Angostura Dam is a hydroelectric power facility located on Chile’s Biobío River, contributing to the country’s renewable energy generation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43d4ce208190b53158c882b222e3 completed March 20, 2026, 12:55 p.m.
NER Named-entity recognition batch_69bd59056bb48190ba1e0b5beda9bdc4 completed March 20, 2026, 2:26 p.m.
NED1 Entity disambiguation (via context triple) batch_69bde0aa114881909fe446bf86c675e7 completed March 21, 2026, 12:04 a.m.
Created at: March 20, 2026, 1:10 p.m.