Triple
T458489
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Caribana |
E7283
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | parade event |
C2339
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: parade event Context triple: [Caribana, instanceOf, parade event]
-
A.
political event
A political event is a planned or spontaneous occurrence involving political actors, institutions, or the public that aims to influence, express, or respond to political power, policy, or public opinion.
-
B.
annual sporting event
An annual sporting event is a recurring, organized athletic competition held once each year, typically featuring established rules, participants, and traditions that attract spectators and media attention.
-
C.
multi-sport event
A multi-sport event is a large-scale organized competition in which athletes from various regions or groups compete across multiple different sports within a unified program and schedule.
-
D.
future event
A future event is an occurrence or happening that has not yet taken place but is anticipated or predicted to occur at a later time.
-
E.
ceremonial bridge
A ceremonial bridge is a specially designed structure used primarily for symbolic, ritual, or commemorative crossings during formal events rather than for everyday transportation.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a2e7e5c5bc8190a1dc8178218fba40 |
completed | Feb. 28, 2026, 1:04 p.m. |
Created at: Feb. 28, 2026, 1:12 p.m.