Triple

T4571822
Position Surface form Disambiguated ID Type / Status
Subject Fremont Bridge E123047 entity
Predicate carries P1393 FINISHED
Object U.S. Route 30 E81375 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 30 | Statement: [Fremont Bridge, carries, U.S. Route 30]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: U.S. Route 30
Context triple: [Fremont Bridge, carries, U.S. Route 30]
  • A. U.S. Route 30 chosen
    U.S. Route 30 is a major east–west U.S. highway that spans from the East Coast to the Midwest, passing through multiple states and serving as an important regional transportation corridor.
  • B. U.S. Route 22
    U.S. Route 22 is a major east–west U.S. highway running from Ohio to New Jersey, serving as an important regional connector through several Mid-Atlantic and Midwestern states.
  • C. U.S. Route 302
    U.S. Route 302 is a U.S. highway in the northeastern United States that runs from Montpelier, Vermont, through New Hampshire, to Portland, Maine.
  • D. U.S. Route 20
    U.S. Route 20 is a major east–west United States highway that stretches from the Pacific Northwest to New England, serving as one of the longest roads in the national highway system.
  • E. U.S. Route 422
    U.S. Route 422 is a U.S. highway running through parts of Ohio and Pennsylvania, connecting cities such as Cleveland, Youngstown, and Reading.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd46466c7081909d07f36be2d08804 completed March 20, 2026, 1:06 p.m.
NER Named-entity recognition batch_69bd58c5afa48190bb8505e2cc16e89f completed March 20, 2026, 2:25 p.m.
NED1 Entity disambiguation (via context triple) batch_69bf486aabac8190a90b4402403078ac completed March 22, 2026, 1:39 a.m.
Created at: March 20, 2026, 1:10 p.m.