Triple

T4552829
Position Surface form Disambiguated ID Type / Status
Subject A10 Tauern Autobahn E120406 entity
Predicate hasRouteNumber P1864 FINISHED
Object A10
A10 is a major Austrian motorway forming part of the Tauern Autobahn, an important north–south transit route through the Alps.
E451569 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A10 | Statement: [A10 Tauern Autobahn, hasRouteNumber, A10]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A10
Context triple: [A10 Tauern Autobahn, hasRouteNumber, A10]
  • A. A10
    The A10 is a major road in England that runs from London northwards through Hertfordshire and Cambridgeshire, forming a key route between the capital and East Anglia.
  • B. A14
    A14 is a major trunk road in England that forms a key east–west freight and commuter route linking the Midlands to the East Coast ports.
  • C. A12
    The A12 is a major road in England that connects London with East Anglia, serving key towns and cities including Ipswich and Colchester.
  • D. A12
    A12 is a major Swiss motorway that connects the regions of Bern and Fribourg, serving as an important north–south transit corridor.
  • E. A13
    A13 is a major Swiss motorway running along the country’s eastern side, providing an important north–south transit route through the Alps.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: A10
Triple: [A10 Tauern Autobahn, hasRouteNumber, A10]
Generated description
A10 is a major Austrian motorway forming part of the Tauern Autobahn, an important north–south transit route through the Alps.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: A10
Target entity description: A10 is a major Austrian motorway forming part of the Tauern Autobahn, an important north–south transit route through the Alps.
  • A. A10
    The A10 is a major road in England that runs from London northwards through Hertfordshire and Cambridgeshire, forming a key route between the capital and East Anglia.
  • B. A14
    A14 is a major trunk road in England that forms a key east–west freight and commuter route linking the Midlands to the East Coast ports.
  • C. A12
    The A12 is a major road in England that connects London with East Anglia, serving key towns and cities including Ipswich and Colchester.
  • D. A12
    A12 is a major Swiss motorway that connects the regions of Bern and Fribourg, serving as an important north–south transit corridor.
  • E. A13
    A13 is a major Swiss motorway running along the country’s eastern side, providing an important north–south transit route through the Alps.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd4636f1648190a701445c2fcd9c17 completed March 20, 2026, 1:05 p.m.
NER Named-entity recognition batch_69bd581160e08190b715a8ce5c3e6c9b completed March 20, 2026, 2:22 p.m.
NED1 Entity disambiguation (via context triple) batch_69bdb95b01b0819094a600752e41aa09 completed March 20, 2026, 9:17 p.m.
NEDg Description generation batch_69bdbdbf73508190b64a78ff9274ee6d completed March 20, 2026, 9:35 p.m.
NED2 Entity disambiguation (via description) batch_69bdbe1bcd8c819094adea59c91c6f5b completed March 20, 2026, 9:37 p.m.
Created at: March 20, 2026, 1:09 p.m.