Triple

T4531403
Position Surface form Disambiguated ID Type / Status
Subject Runway 10/28 E106305 entity
Predicate instanceOf P0 FINISHED
Object infrastructure element C3206 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: infrastructure element
Context triple: [Runway 10/28, instanceOf, infrastructure element]
  • A. infrastructure facility
    An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
  • B. railway infrastructure element
    A railway infrastructure element is any physical component of a rail system—such as tracks, signals, switches, bridges, or platforms—that supports the safe and efficient operation of trains.
  • C. infrastructure chosen
    Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
  • D. infrastructure project
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • E. telecommunications infrastructure component
    A telecommunications infrastructure component is a physical or virtual element—such as cables, antennas, switches, or routers—that enables the transmission, routing, and management of voice, data, and multimedia communications across networks.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43f3d6e08190a91824f833d51bbe completed March 20, 2026, 12:56 p.m.
Created at: March 20, 2026, 1:03 p.m.