Triple
T4531403
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Runway 10/28 |
E106305
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | infrastructure element |
C3206
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: infrastructure element Context triple: [Runway 10/28, instanceOf, infrastructure element]
-
A.
infrastructure facility
An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
-
B.
railway infrastructure element
A railway infrastructure element is any physical component of a rail system—such as tracks, signals, switches, bridges, or platforms—that supports the safe and efficient operation of trains.
-
C.
infrastructure
chosen
Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
-
D.
infrastructure project
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
-
E.
telecommunications infrastructure component
A telecommunications infrastructure component is a physical or virtual element—such as cables, antennas, switches, or routers—that enables the transmission, routing, and management of voice, data, and multimedia communications across networks.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd43f3d6e08190a91824f833d51bbe |
completed | March 20, 2026, 12:56 p.m. |
Created at: March 20, 2026, 1:03 p.m.