Triple

T4491095
Position Surface form Disambiguated ID Type / Status
Subject Nickajack Dam E107373 entity
Predicate downstreamFrom P5956 FINISHED
Object Chickamauga Dam E108822 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Chickamauga Dam | Statement: [Nickajack Dam, downstreamFrom, Chickamauga Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Chickamauga Dam
Context triple: [Nickajack Dam, downstreamFrom, Chickamauga Dam]
  • A. Chickamauga Dam chosen
    Chickamauga Dam is a Tennessee Valley Authority hydroelectric dam and navigation lock structure near Chattanooga, Tennessee, that helps generate power, control flooding, and improve river transportation on the Tennessee River.
  • B. High Rock Dam
    High Rock Dam is a hydroelectric dam in North Carolina that impounds the Yadkin River to form High Rock Lake, a major reservoir for power generation and recreation.
  • C. Hartwell Dam
    Hartwell Dam is a large hydroelectric and flood-control dam on the Savannah River that creates Lake Hartwell along the Georgia–South Carolina border.
  • D. Goodwin Dam
    Goodwin Dam is a concrete gravity diversion dam on California’s Stanislaus River that helps regulate river flow and supplies irrigation water to surrounding agricultural areas.
  • E. Buford Dam
    Buford Dam is a large hydroelectric and flood-control dam in Georgia that creates Lake Lanier and helps regulate water flow and supply for the Atlanta metropolitan area.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43f84f788190a1383579c4a595be completed March 20, 2026, 12:56 p.m.
NER Named-entity recognition batch_69bd556e69f88190b9c16afc2afcdbef completed March 20, 2026, 2:10 p.m.
NED1 Entity disambiguation (via context triple) batch_69be5c70e6cc8190b447d3bd1f578aae completed March 21, 2026, 8:53 a.m.
Created at: March 20, 2026, 12:59 p.m.