Triple

T4491041
Position Surface form Disambiguated ID Type / Status
Subject Guntersville Dam E107372 entity
Predicate partOf P40 FINISHED
Object Tennessee Valley Authority system E136 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tennessee Valley Authority system | Statement: [Guntersville Dam, partOf, Tennessee Valley Authority system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tennessee Valley Authority system
Context triple: [Guntersville Dam, partOf, Tennessee Valley Authority system]
  • A. Tennessee Valley Authority chosen
    The Tennessee Valley Authority is a federally owned U.S. corporation created during the New Deal to provide regional economic development, flood control, and electricity generation in the Tennessee Valley.
  • B. Watts Bar Dam
    Watts Bar Dam is a Tennessee Valley Authority hydroelectric and navigation dam on the Tennessee River in eastern Tennessee.
  • C. Southwestern Power Administration
    Southwestern Power Administration is a U.S. federal agency that markets and transmits hydroelectric power generated at federally owned dams across the southwestern region.
  • D. Columbia Basin Project
    The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
  • E. Columbia River hydropower system
    The Columbia River hydropower system is an extensive network of dams and generating facilities that provides a major share of the Pacific Northwest’s electricity while also supporting irrigation, navigation, and flood control.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43f84f788190a1383579c4a595be completed March 20, 2026, 12:56 p.m.
NER Named-entity recognition batch_69bd556e69f88190b9c16afc2afcdbef completed March 20, 2026, 2:10 p.m.
NED1 Entity disambiguation (via context triple) batch_69bd7f6cf46c8190a4cd9075324ecc7d completed March 20, 2026, 5:10 p.m.
Created at: March 20, 2026, 12:59 p.m.