Triple

T4488713
Position Surface form Disambiguated ID Type / Status
Subject Eleventh Avenue E107313 entity
Predicate formsPartOf P840 FINISHED
Object West Side Highway corridor (local component in some segments)
The West Side Highway corridor (local component in some segments) is a major north–south traffic route along Manhattan’s west side that integrates surface streets and highway segments to carry vehicles between Lower Manhattan and the Upper West Side.
E446917 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: West Side Highway corridor (local component in some segments) | Statement: [Eleventh Avenue, formsPartOf, West Side Highway corridor (local component in some segments)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: West Side Highway corridor (local component in some segments)
Context triple: [Eleventh Avenue, formsPartOf, West Side Highway corridor (local component in some segments)]
  • A. East–West Road (nearby corridor)
    East–West Road (nearby corridor) is a major federal highway in southern Nigeria that serves as a key transportation and economic artery for communities in and around Obio-Akpor Local Government Area.
  • B. Interstate 5 corridor (west side suburbs)
    The Interstate 5 corridor (west side suburbs) is a major suburban transportation and development axis running along the western side of the Portland metropolitan area parallel to Interstate 5.
  • C. Edgewood Avenue corridor
    The Edgewood Avenue corridor is a historically significant commercial and cultural strip in Atlanta known for its vibrant nightlife, street art, and proximity to the Sweet Auburn civil rights district.
  • D. Western Avenue corridor
    The Western Avenue corridor is a key urban thoroughfare and development zone in Boston’s Allston neighborhood that serves as a central spine for Harvard University’s expanding Allston campus and surrounding mixed-use projects.
  • E. Highway 60 corridor
    The Highway 60 corridor is the main east–west road and visitor access route running through the southern portion of Algonquin Provincial Park, lined with campgrounds, trails, and scenic viewpoints.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: West Side Highway corridor (local component in some segments)
Triple: [Eleventh Avenue, formsPartOf, West Side Highway corridor (local component in some segments)]
Generated description
The West Side Highway corridor (local component in some segments) is a major north–south traffic route along Manhattan’s west side that integrates surface streets and highway segments to carry vehicles between Lower Manhattan and the Upper West Side.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: West Side Highway corridor (local component in some segments)
Target entity description: The West Side Highway corridor (local component in some segments) is a major north–south traffic route along Manhattan’s west side that integrates surface streets and highway segments to carry vehicles between Lower Manhattan and the Upper West Side.
  • A. East–West Road (nearby corridor)
    East–West Road (nearby corridor) is a major federal highway in southern Nigeria that serves as a key transportation and economic artery for communities in and around Obio-Akpor Local Government Area.
  • B. Interstate 5 corridor (west side suburbs)
    The Interstate 5 corridor (west side suburbs) is a major suburban transportation and development axis running along the western side of the Portland metropolitan area parallel to Interstate 5.
  • C. Edgewood Avenue corridor
    The Edgewood Avenue corridor is a historically significant commercial and cultural strip in Atlanta known for its vibrant nightlife, street art, and proximity to the Sweet Auburn civil rights district.
  • D. Western Avenue corridor
    The Western Avenue corridor is a key urban thoroughfare and development zone in Boston’s Allston neighborhood that serves as a central spine for Harvard University’s expanding Allston campus and surrounding mixed-use projects.
  • E. Highway 60 corridor
    The Highway 60 corridor is the main east–west road and visitor access route running through the southern portion of Algonquin Provincial Park, lined with campgrounds, trails, and scenic viewpoints.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43f84f788190a1383579c4a595be completed March 20, 2026, 12:56 p.m.
NER Named-entity recognition batch_69bd52ad36748190b791de458f2116b2 completed March 20, 2026, 1:59 p.m.
NED1 Entity disambiguation (via context triple) batch_69bd67a90f308190ab4f912cd1e2f692 completed March 20, 2026, 3:28 p.m.
NEDg Description generation batch_69bd68d76cfc819083071015add540dc completed March 20, 2026, 3:33 p.m.
NED2 Entity disambiguation (via description) batch_69bd698f0f148190ae3ad5193cba0851 completed March 20, 2026, 3:36 p.m.
Created at: March 20, 2026, 12:59 p.m.