Triple

T4475849
Position Surface form Disambiguated ID Type / Status
Subject Shenzhen Metro Line 2 E100006 entity
Predicate instanceOf P0 FINISHED
Object Shenzhen Metro line C640 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Shenzhen Metro line
Context triple: [Shenzhen Metro Line 2, instanceOf, Shenzhen Metro line]
  • A. subway line
    A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
  • B. rapid transit line segment
    A rapid transit line segment is a contiguous portion of a rapid transit route between two defined points (such as stations, junctions, or terminals) that carries high-frequency, high-capacity passenger rail service.
  • C. rapid transit line chosen
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • D. metro train
    A metro train is an electrically powered, multi-car rail vehicle designed to transport large numbers of passengers quickly and frequently along dedicated urban and suburban transit lines.
  • E. light rail transit line
    A light rail transit line is a fixed-route urban or suburban rail corridor using electrically powered, relatively low-capacity trains that operate on dedicated or semi-exclusive tracks to provide frequent, short- to medium-distance passenger service.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b34553cbe48190afa8ac1cac285b86 completed March 12, 2026, 10:59 p.m.
Created at: March 12, 2026, 11:35 p.m.