Triple

T446873
Position Surface form Disambiguated ID Type / Status
Subject Arlington Transit E7040 entity
Predicate instanceOf P0 FINISHED
Object local transit agency C221 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: local transit agency
Context triple: [Arlington Transit, instanceOf, local transit agency]
  • A. public transportation agency
    A public transportation agency is an organization responsible for planning, operating, and managing shared transit services such as buses, trains, and other modes to provide mobility for the public within a defined region.
  • B. mass transit operator chosen
    A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
  • C. public transit system
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • D. regional planning agency
    A regional planning agency is an organization responsible for coordinating land use, transportation, infrastructure, and environmental planning across multiple jurisdictions within a defined geographic region.
  • E. commuter rail station
    A commuter rail station is a designated facility where passengers board and alight regional trains that connect suburbs or outlying areas with urban centers, typically offering platforms, ticketing, and basic passenger amenities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e7e4676c81909ea0dbdecac0687c completed Feb. 28, 2026, 1:04 p.m.
Created at: Feb. 28, 2026, 1:12 p.m.