Triple

T4466764
Position Surface form Disambiguated ID Type / Status
Subject Itaipu Dam E98397 entity
Predicate instanceOf P0 FINISHED
Object binational infrastructure project C2938 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: binational infrastructure project
Context triple: [Itaipu Dam, instanceOf, binational infrastructure project]
  • A. infrastructure project chosen
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • B. intergovernmental programme
    An intergovernmental programme is a coordinated set of policies, activities, or initiatives jointly designed, funded, and implemented by multiple governments or international organizations to address shared issues or achieve common goals across borders.
  • C. bilateral relations
    Bilateral relations are the political, economic, and diplomatic interactions and agreements that occur directly between two sovereign states.
  • D. bridge–tunnel complex
    A bridge–tunnel complex is an integrated transportation structure that combines bridge spans and underwater tunnels to carry traffic across wide bodies of water or other large obstacles.
  • E. international border
    An international border is a legally defined geographic boundary that separates the territories and jurisdictions of two or more sovereign states.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b3454b4ae481908967426dd37284d6 completed March 12, 2026, 10:59 p.m.
Created at: March 12, 2026, 11:34 p.m.