Triple

T4443569
Position Surface form Disambiguated ID Type / Status
Subject gc (Go compiler) E96227 entity
Predicate instanceOf P0 FINISHED
Object software toolchain component C15486 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: software toolchain component
Context triple: [gc (Go compiler), instanceOf, software toolchain component]
  • A. developer tool chosen
    A developer tool is a software application or utility designed to help programmers create, test, debug, and maintain code more efficiently.
  • B. integrated development environment component
    An integrated development environment component is a modular tool or feature within an IDE that provides specific functionality—such as code editing, debugging, or project management—to support and streamline software development.
  • C. computational tool
    A computational tool is a software or hardware resource designed to perform, automate, or assist with data processing, analysis, or problem-solving tasks.
  • D. collection of programming tools
    A collection of programming tools is an organized set of software utilities, libraries, and environments designed to assist developers in writing, testing, debugging, and maintaining code efficiently.
  • E. software package
    A software package is a bundled collection of programs, libraries, configuration files, and metadata distributed together to provide specific functionality that can be easily installed, updated, and managed.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b345415ba481908df738e7174448ba completed March 12, 2026, 10:59 p.m.
Created at: March 12, 2026, 11:32 p.m.