Triple
T4437288
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | London Docks |
E95682
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | former port facility |
C16030
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: former port facility Context triple: [London Docks, instanceOf, former port facility]
-
A.
port facility personnel
Port facility personnel are individuals responsible for the operation, security, safety, and management of activities and infrastructure within a port facility.
-
B.
inland port
An inland port is a logistics and transportation hub located away from coastal seaports, typically along rivers, canals, or rail corridors, that facilitates the transfer, storage, and distribution of goods between different modes of transport.
-
C.
port authority
A port authority is an organization responsible for managing, regulating, and developing a seaport or group of ports, including their infrastructure, operations, and related maritime activities.
-
D.
former port city
A former port city is an urban settlement that once functioned as a significant maritime trade hub but has since lost its port operations or primary seafaring role due to economic, environmental, or infrastructural changes.
-
E.
port area
A port area is a designated coastal or riverside zone equipped with infrastructure and facilities for the berthing, loading, unloading, storage, and transfer of cargo and passengers between land and water transport.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69b3453ea2b48190a26f154b3b8fece5 |
completed | March 12, 2026, 10:59 p.m. |
Created at: March 12, 2026, 11:31 p.m.