Triple

T4425981
Position Surface form Disambiguated ID Type / Status
Subject E-Rate program E95210 entity
Predicate instanceOf P0 FINISHED
Object universal service support mechanism C16004 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: universal service support mechanism
Context triple: [E-Rate program, instanceOf, universal service support mechanism]
  • A. shared service centre
    A shared service centre is a centralized organizational unit that consolidates and delivers common support functions (such as finance, HR, or IT) to multiple business units to improve efficiency, standardization, and cost-effectiveness.
  • B. uniform system
    A uniform system is a conceptual model in which properties such as composition, structure, and behavior are assumed to be consistent and invariant throughout the entire system.
  • C. through service
    A through service is a transportation offering in which a vehicle or passenger travels from origin to destination across one or more intermediate points without requiring a transfer or change of service.
  • D. support branch
    A support branch is a temporary code line created from a stable base to isolate, develop, and deliver urgent fixes or minor updates without disrupting ongoing mainline or feature development.
  • E. universal
    A universal is an abstract property or relation that can be instantiated by multiple particular things, allowing them to share common features or characteristics.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b3453c2a0c8190926b574c90766db9 completed March 12, 2026, 10:59 p.m.
Created at: March 12, 2026, 11:30 p.m.