Triple
T4424328
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Prompt Global Strike |
E95174
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | military concept |
C4796
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: military concept Context triple: [Prompt Global Strike, instanceOf, military concept]
-
A.
military strategy
chosen
Military strategy is the high-level planning and directing of armed forces and resources to achieve political and military objectives in war or conflict.
-
B.
military system
A military system is an organized structure of personnel, equipment, doctrines, and processes designed to plan, conduct, and support defense and combat operations.
-
C.
military structure
A military structure is an organized framework of ranks, units, and command relationships that defines how armed forces are arranged, governed, and coordinated to conduct operations.
-
D.
military technology
Military technology encompasses the specialized tools, systems, and innovations developed and used by armed forces to enhance their capabilities in defense, offense, intelligence, and logistics.
-
E.
military organization
A military organization is a structured group of armed forces personnel and resources, organized under a defined hierarchy and command system, to plan, coordinate, and conduct defense and combat operations in support of a state’s strategic objectives.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69b3453a36908190b95a79a297ca083c |
completed | March 12, 2026, 10:59 p.m. |
Created at: March 12, 2026, 11:30 p.m.