Triple

T4424186
Position Surface form Disambiguated ID Type / Status
Subject Caterpillar Inc. E95171 entity
Predicate instanceOf P0 FINISHED
Object construction equipment manufacturer C136 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: construction equipment manufacturer
Context triple: [Caterpillar Inc., instanceOf, construction equipment manufacturer]
  • A. construction and trading company
    A construction and trading company is a business entity that both executes building and infrastructure projects and engages in the procurement, sale, and distribution of construction-related materials, equipment, or goods.
  • B. construction management firm
    A construction management firm is a professional organization that plans, coordinates, and oversees construction projects from inception to completion, ensuring they are delivered on time, within budget, and to specified quality and safety standards.
  • C. commercial vehicle manufacturer
    A commercial vehicle manufacturer is a company that designs, produces, and sells vehicles intended primarily for business use, such as trucks, buses, and vans, to transport goods or passengers.
  • D. manufacturing company chosen
    A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
  • E. engineering firm
    An engineering firm is a business organization that provides professional engineering services—such as design, analysis, consulting, and project management—to plan, develop, and implement technical solutions for clients in various industries.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b3453a36908190b95a79a297ca083c completed March 12, 2026, 10:59 p.m.
Created at: March 12, 2026, 11:30 p.m.