Triple
T4412281
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Darley Stud |
E94877
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | stallion station |
C4157
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: stallion station Context triple: [Darley Stud, instanceOf, stallion station]
-
A.
stabling facility
chosen
A stabling facility is a specialized structure or complex designed to house, feed, care for, and manage horses or other livestock in a safe and organized environment.
-
B.
royal stables complex
A royal stables complex is an organized ensemble of buildings and yards designed to house, train, and maintain horses and related equipment for a royal household’s transportation, ceremonial, and military needs.
-
C.
mountain station
A mountain station is a facility or settlement located at a high elevation in mountainous terrain, typically serving as a base for transportation, research, tourism, or outdoor activities.
-
D.
field station
A field station is a dedicated facility located in a natural or semi-natural environment that supports long-term scientific research, monitoring, and education.
-
E.
AeroTrain station
An AeroTrain station is a designated facility where passengers board, disembark, and transfer between AeroTrains, providing platforms, ticketing, waiting areas, and related services for high-speed or automated airport rail transit.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69b34539638c8190abfea3eb29425210 |
completed | March 12, 2026, 10:59 p.m. |
Created at: March 12, 2026, 11:29 p.m.