Triple
T4401927
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kirchhoff's circuit laws |
E93638
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | electrical law |
C10651
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: electrical law Context triple: [Kirchhoff's circuit laws, instanceOf, electrical law]
-
A.
electric utility
An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
-
B.
electrical engineering concept
chosen
An electrical engineering concept is a fundamental principle or idea that explains how electrical systems and components behave, interact, and can be designed or controlled to perform useful functions.
-
C.
electrical engineering course
An electrical engineering course is a structured program of study that teaches the principles, analysis, and application of electrical and electronic systems, circuits, and technologies.
-
D.
electric motor
An electric motor is a device that converts electrical energy into mechanical rotational energy through the interaction of magnetic fields and current-carrying conductors.
-
E.
electrified railway
An electrified railway is a rail transport system in which trains receive power from external electrical sources, such as overhead lines or third rails, instead of relying on onboard fuel.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69b345158c748190a2c040fce2da9980 |
completed | March 12, 2026, 10:58 p.m. |
Created at: March 12, 2026, 11:28 p.m.