Triple

T4387260
Position Surface form Disambiguated ID Type / Status
Subject Hillsboro Central Transit Center E99273 entity
Predicate onLine P1293 FINISHED
Object MAX Blue Line E21652 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: MAX Blue Line | Statement: [Hillsboro Central Transit Center, onLine, MAX Blue Line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: MAX Blue Line
Context triple: [Hillsboro Central Transit Center, onLine, MAX Blue Line]
  • A. MAX Blue Line chosen
    MAX Blue Line is a light rail service in the Portland, Oregon metropolitan area that connects downtown Portland with eastern and western suburbs as part of the region’s MAX Light Rail system.
  • B. Blue Line
    The Blue Line is one of the main lines of the Lisbon Metro system, serving key central and northern areas of Portugal’s capital city.
  • C. Blue Line
    The Blue Line is one of the color-coded rapid transit routes in the Washington Metro system, running through key parts of Washington, D.C. and its Virginia suburbs.
  • D. Blue Line
    The Blue Line is a light rail route in the Dallas Area Rapid Transit (DART) system serving key neighborhoods and suburbs in the Dallas–Fort Worth metroplex.
  • E. Blue Line
    The Blue Line is a planned rapid transit corridor of Bengaluru’s Namma Metro network intended to expand connectivity across additional parts of the city.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b3454f739481909ff6c28331f0c0b9 completed March 12, 2026, 10:59 p.m.
NER Named-entity recognition batch_69b352804be88190ab188ac0dde1ac1e completed March 12, 2026, 11:55 p.m.
NED1 Entity disambiguation (via context triple) batch_69b5e52a0488819081fe724d592d8fdf completed March 14, 2026, 10:46 p.m.
Created at: March 12, 2026, 11:19 p.m.