Triple

T4375966
Position Surface form Disambiguated ID Type / Status
Subject Terminal 2G E99006 entity
Predicate instanceOf P0 FINISHED
Object satellite terminal C6199 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: satellite terminal
Context triple: [Terminal 2G, instanceOf, satellite terminal]
  • A. geostationary communications satellite
    A geostationary communications satellite is a spacecraft positioned in an equatorial orbit that matches Earth's rotation, remaining fixed over one longitude to relay telecommunications signals between ground stations.
  • B. ground segment equipment chosen
    Ground segment equipment comprises the terrestrial hardware and software systems that support, control, communicate with, and process data from space-based assets such as satellites.
  • C. space communication network
    A space communication network is an interconnected system of ground stations, satellites, and relay nodes that enables the reliable transmission, routing, and reception of data across space and between space-based and terrestrial assets.
  • D. telecommunications infrastructure component
    A telecommunications infrastructure component is a physical or virtual element—such as cables, antennas, switches, or routers—that enables the transmission, routing, and management of voice, data, and multimedia communications across networks.
  • E. satellite program
    A satellite program is an organized initiative that designs, builds, launches, and operates satellites to achieve specific objectives such as communication, Earth observation, navigation, or scientific research.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b3454ea8f48190a49c2436624d6ef6 completed March 12, 2026, 10:59 p.m.
Created at: March 12, 2026, 11:18 p.m.