Triple
T4375808
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Houston Ship Channel |
E99003
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | canalized waterway |
C3393
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: canalized waterway Context triple: [Houston Ship Channel, instanceOf, canalized waterway]
-
A.
navigable waterway
chosen
A navigable waterway is a natural or artificial body of water, such as a river, canal, or channel, that is deep and wide enough for vessels to travel safely for transportation or commerce.
-
B.
drainage channel
A drainage channel is a constructed or natural linear feature designed to collect and convey excess surface or subsurface water away from an area to prevent flooding, erosion, or waterlogging.
-
C.
waterway network
A waterway network is an interconnected system of natural and artificial water channels (such as rivers, canals, and streams) designed or utilized for the movement, distribution, and management of water and waterborne transport.
-
D.
canal aqueduct
A canal aqueduct is a bridge-like structure that carries a navigable waterway over obstacles such as rivers, valleys, roads, or other canals.
-
E.
seasonal watercourse
A seasonal watercourse is a natural channel that carries flowing water only during certain times of the year, typically in response to precipitation or snowmelt, and remains dry or with minimal flow for the rest of the year.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69b3454ea8f48190a49c2436624d6ef6 |
completed | March 12, 2026, 10:59 p.m. |
Created at: March 12, 2026, 11:18 p.m.