Triple

T4350100
Position Surface form Disambiguated ID Type / Status
Subject CTA bus route 152 Addison E98002 entity
Predicate instanceOf P0 FINISHED
Object Chicago Transit Authority bus route C15767 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Chicago Transit Authority bus route
Context triple: [CTA bus route 152 Addison, instanceOf, Chicago Transit Authority bus route]
  • A. bus rapid transit line
    A bus rapid transit line is a high-capacity bus corridor that uses dedicated lanes, priority signaling, and streamlined stations to provide fast, reliable, rail-like transit service.
  • B. trolleybus line
    A trolleybus line is a designated public transit route served by electrically powered buses that draw current from overhead wires along the roadway.
  • C. public transit system
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • D. public transportation agency
    A public transportation agency is an organization responsible for planning, operating, and managing shared transit services such as buses, trains, and other modes to provide mobility for the public within a defined region.
  • E. streetcar route
    A streetcar route is a predefined path along public streets that streetcars follow to provide scheduled passenger transportation between specific stops or terminals.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b3454965f881908c41190bb22f0e4b completed March 12, 2026, 10:59 p.m.
Created at: March 12, 2026, 11:15 p.m.