Triple

T4347821
Position Surface form Disambiguated ID Type / Status
Subject New York Power Authority E97946 entity
Predicate operatesFacility P4904 FINISHED
Object Niagara Power Project E63650 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Niagara Power Project | Statement: [New York Power Authority, operatesFacility, Niagara Power Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Niagara Power Project
Context triple: [New York Power Authority, operatesFacility, Niagara Power Project]
  • A. Niagara River hydropower system
    The Niagara River hydropower system is a large binational network of dams, tunnels, and generating stations on the Niagara River that harnesses the river’s flow and Niagara Falls to produce significant hydroelectric power for Canada and the United States.
  • B. Niagara District
    The Niagara District was a historical administrative region in Upper Canada that encompassed the town of Newark (now Niagara-on-the-Lake) and surrounding areas along the Niagara River.
  • C. Niagara Falls AC power project
    The Niagara Falls AC power project was a pioneering late-19th-century hydroelectric installation that demonstrated the practicality of long-distance alternating current transmission and helped establish AC as the dominant standard for electric power systems.
  • D. Robert Moses Niagara Power Plant chosen
    The Robert Moses Niagara Power Plant is a major hydroelectric generating station in New York that harnesses the flow of the Niagara River to produce electricity.
  • E. Sir Adam Beck Hydroelectric Generating Stations
    The Sir Adam Beck Hydroelectric Generating Stations are a major complex of hydroelectric power plants on the Niagara River in Ontario, Canada, that harness the flow of Niagara Falls to generate electricity for the province.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b34548402c819085ab68b27c235a87 completed March 12, 2026, 10:59 p.m.
NER Named-entity recognition batch_69b351a5559c819081608b0aaf6a0e66 completed March 12, 2026, 11:52 p.m.
NED1 Entity disambiguation (via context triple) batch_69b5dbad2f908190b5ee53bc7f2294c9 completed March 14, 2026, 10:05 p.m.
Created at: March 12, 2026, 11:15 p.m.