Triple
T4316436
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Englewood Branch |
E96403
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | former transit line |
C15590
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: former transit line Context triple: [Englewood Branch, instanceOf, former transit line]
-
A.
tram line
A tram line is a designated route, typically with fixed tracks and stops, along which trams operate to provide urban or suburban public transportation.
-
B.
former Los Angeles Metro Rail line
A former Los Angeles Metro Rail line is a previously operated light rail or rapid transit route within the Los Angeles Metro Rail system that has since been discontinued, restructured, or replaced.
-
C.
commuter rail line
A commuter rail line is a passenger train service that operates on fixed tracks and schedules to connect suburban or outlying areas with a central city, primarily serving daily work and school commuters.
-
D.
bus rapid transit line
A bus rapid transit line is a high-capacity bus corridor that uses dedicated lanes, priority signaling, and streamlined stations to provide fast, reliable, rail-like transit service.
-
E.
subway line
A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69b345422aac81909ddbadae437d122e |
completed | March 12, 2026, 10:59 p.m. |
Created at: March 12, 2026, 11:12 p.m.