Triple

T429879
Position Surface form Disambiguated ID Type / Status
Subject Castillo San Cristóbal E9689 entity
Predicate instanceOf P0 FINISHED
Object military fortification C1086 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: military fortification
Context triple: [Castillo San Cristóbal, instanceOf, military fortification]
  • A. military fortification system
    A military fortification system is an integrated network of defensive structures, obstacles, and support facilities designed to protect territory, forces, and strategic assets from enemy attack.
  • B. line of fortifications
    A line of fortifications is a connected series of defensive structures, such as walls, trenches, and strongpoints, designed to protect a territory or position by forming a continuous or coordinated barrier against attack.
  • C. military installation chosen
    A military installation is a designated facility or area where armed forces are stationed, trained, equipped, and supported to conduct defense and security operations.
  • D. border defense system
    A border defense system is an integrated network of physical barriers, surveillance technologies, personnel, and response protocols designed to monitor, control, and protect a nation's boundaries from unauthorized crossings and external threats.
  • E. front (military)
    The military front is the forward-most line or zone of contact between opposing armed forces where active combat operations are concentrated.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e801e1d48190b505d1dd336b52ac completed Feb. 28, 2026, 1:05 p.m.
Created at: Feb. 28, 2026, 1:11 p.m.