Triple
T4296962
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Irchel campus, University of Zurich |
E99736
|
entity |
| Predicate | hasPart |
P35
|
FINISHED |
| Object |
Department of Physics buildings
The Department of Physics buildings are the dedicated facilities of the University of Zurich’s physics department located on the Irchel campus, housing its teaching, research, and laboratory spaces.
|
E429597
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Department of Physics buildings | Statement: [Irchel campus, University of Zurich, hasPart, Department of Physics buildings]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Department of Physics buildings Context triple: [Irchel campus, University of Zurich, hasPart, Department of Physics buildings]
-
A.
Faculty of Sciences buildings
The Faculty of Sciences buildings are a complex of academic and research facilities at UNAM’s main campus dedicated to teaching and advancing disciplines such as mathematics, physics, biology, and related sciences.
-
B.
School of Engineering & Applied Science buildings
School of Engineering & Applied Science buildings are specialized academic facilities that house engineering and applied science departments, laboratories, classrooms, and research centers within a university.
-
C.
Faculty of Philosophy and Letters buildings
The Faculty of Philosophy and Letters buildings are a central academic complex at UNAM’s main campus that houses humanities and philosophy departments, classrooms, libraries, and cultural spaces.
-
D.
Life Sciences Building
The Life Sciences Building is a major academic and research facility on York University’s Keele Campus dedicated to biological and health-related sciences.
-
E.
Medical Sciences Building
The Medical Sciences Building is a major academic and research facility at the University of Toronto that houses laboratories, classrooms, and offices for health and biomedical sciences.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Department of Physics buildings Triple: [Irchel campus, University of Zurich, hasPart, Department of Physics buildings]
Generated description
The Department of Physics buildings are the dedicated facilities of the University of Zurich’s physics department located on the Irchel campus, housing its teaching, research, and laboratory spaces.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Department of Physics buildings Target entity description: The Department of Physics buildings are the dedicated facilities of the University of Zurich’s physics department located on the Irchel campus, housing its teaching, research, and laboratory spaces.
-
A.
Faculty of Sciences buildings
The Faculty of Sciences buildings are a complex of academic and research facilities at UNAM’s main campus dedicated to teaching and advancing disciplines such as mathematics, physics, biology, and related sciences.
-
B.
School of Engineering & Applied Science buildings
School of Engineering & Applied Science buildings are specialized academic facilities that house engineering and applied science departments, laboratories, classrooms, and research centers within a university.
-
C.
Faculty of Philosophy and Letters buildings
The Faculty of Philosophy and Letters buildings are a central academic complex at UNAM’s main campus that houses humanities and philosophy departments, classrooms, libraries, and cultural spaces.
-
D.
Life Sciences Building
The Life Sciences Building is a major academic and research facility on York University’s Keele Campus dedicated to biological and health-related sciences.
-
E.
Medical Sciences Building
The Medical Sciences Building is a major academic and research facility at the University of Toronto that houses laboratories, classrooms, and offices for health and biomedical sciences.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69b3455175088190aa79c6e03b86647e |
completed | March 12, 2026, 10:59 p.m. |
| NER | Named-entity recognition | batch_69b3509aebd48190af38f2e37f07869a |
completed | March 12, 2026, 11:47 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69b5c7439b3481908d2554f7b86002aa |
completed | March 14, 2026, 8:38 p.m. |
| NEDg | Description generation | batch_69b5c95ac9188190bded2c31e969b63b |
completed | March 14, 2026, 8:47 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69b5c9dc6ca4819098d00e6c03edf56a |
completed | March 14, 2026, 8:49 p.m. |
Created at: March 12, 2026, 11:08 p.m.