Triple

T4290732
Position Surface form Disambiguated ID Type / Status
Subject Central station (Purple Line) E99583 entity
Predicate partOfNetwork P840 FINISHED
Object Chicago 'L' E15398 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Chicago 'L' | Statement: [Central station (Purple Line), partOfNetwork, Chicago 'L']
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Chicago 'L'
Context triple: [Central station (Purple Line), partOfNetwork, Chicago 'L']
  • A. Chicago "L" chosen
    The Chicago "L" is the elevated rapid transit system serving Chicago and some surrounding suburbs, known for its iconic above-ground tracks and extensive urban rail network.
  • B. MAX Red Line light rail
    The MAX Red Line light rail is a public transit service in the Portland metropolitan area that connects downtown Portland with Portland International Airport and other key destinations.
  • C. Brown Line
    The Brown Line is a rapid transit route of Chicago's "L" system that primarily serves the city's North Side and northwest neighborhoods.
  • D. Metra
    Metra is the commuter rail system serving the Chicago metropolitan area, operating extensive routes that connect the city with its surrounding suburbs.
  • E. Red Line (Chicago "L")
    The Red Line is a major rapid transit route of the Chicago "L" system, running north–south through the city and operating 24 hours a day.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b3455175088190aa79c6e03b86647e completed March 12, 2026, 10:59 p.m.
NER Named-entity recognition batch_69b3507efb28819091a9d5b9161a5008 completed March 12, 2026, 11:47 p.m.
NED1 Entity disambiguation (via context triple) batch_69b5c73501f4819088bf87f3c4d0f23b completed March 14, 2026, 8:38 p.m.
Created at: March 12, 2026, 11:08 p.m.