Triple

T428218
Position Surface form Disambiguated ID Type / Status
Subject Pella Corporation E9656 entity
Predicate instanceOf P0 FINISHED
Object door manufacturer C136 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: door manufacturer
Context triple: [Pella Corporation, instanceOf, door manufacturer]
  • A. building
    A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
  • B. manufacturing company chosen
    A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
  • C. gateway
    A gateway is a conceptual class that represents a controlled entry and exit point between different systems, networks, or domains, managing and regulating the flow of data, requests, or entities across boundaries.
  • D. architect
    An architect is a professional who plans, designs, and oversees the construction of buildings and other structures, balancing functionality, safety, aesthetics, and client needs.
  • E. seaport
    A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e801e1d48190b505d1dd336b52ac completed Feb. 28, 2026, 1:05 p.m.
Created at: Feb. 28, 2026, 1:11 p.m.