Triple

T428217
Position Surface form Disambiguated ID Type / Status
Subject Pella Corporation E9656 entity
Predicate instanceOf P0 FINISHED
Object window manufacturer C423 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: window manufacturer
Context triple: [Pella Corporation, instanceOf, window manufacturer]
  • A. manufacturing company
    A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
  • B. architect
    An architect is a professional who plans, designs, and oversees the construction of buildings and other structures, balancing functionality, safety, aesthetics, and client needs.
  • C. building
    A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
  • D. conductor
    A conductor is an individual who directs the performance of an orchestra, choir, or other musical ensemble by guiding tempo, dynamics, and expression to unify the musicians’ interpretation of a piece.
  • E. company chosen
    A company is an organized entity, legally recognized or informally structured, that coordinates people and resources to produce goods or services for customers, typically in pursuit of profit or specific objectives.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e801e1d48190b505d1dd336b52ac completed Feb. 28, 2026, 1:05 p.m.
Created at: Feb. 28, 2026, 1:11 p.m.