Triple

T4281003
Position Surface form Disambiguated ID Type / Status
Subject Associated British Ports E97149 entity
Predicate instanceOf P0 FINISHED
Object infrastructure owner C6404 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: infrastructure owner
Context triple: [Associated British Ports, instanceOf, infrastructure owner]
  • A. infrastructure management company
    An infrastructure management company plans, operates, maintains, and optimizes physical assets and systems—such as transportation, utilities, and public works—to ensure their reliability, efficiency, and long-term performance.
  • B. transport infrastructure operator chosen
    A transport infrastructure operator is an entity responsible for managing, maintaining, and regulating transportation networks and facilities such as roads, railways, ports, or airports to ensure safe and efficient movement of people and goods.
  • C. infrastructure
    Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
  • D. railway infrastructure manager
    A railway infrastructure manager is an entity responsible for the planning, construction, maintenance, operation, and safe management of railway tracks, signaling systems, and related fixed installations.
  • E. infrastructure facility
    An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b34544be3c819084d1ab82d29f90c5 completed March 12, 2026, 10:59 p.m.
Created at: March 12, 2026, 11:07 p.m.