Triple

T4279544
Position Surface form Disambiguated ID Type / Status
Subject Google Cloud Pub/Sub E97116 entity
Predicate instanceOf P0 FINISHED
Object publish–subscribe messaging system C10341 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: publish–subscribe messaging system
Context triple: [Google Cloud Pub/Sub, instanceOf, publish–subscribe messaging system]
  • A. messaging framework chosen
    A messaging framework is a structured system that defines how messages are formatted, transmitted, routed, and processed between distributed components or applications.
  • B. publishing system
    A publishing system is a coordinated set of tools and processes that manage the creation, editing, formatting, approval, and distribution of content to various audiences and platforms.
  • C. messaging standard
    A messaging standard is a defined set of rules and formats that enables different systems or applications to exchange messages in a consistent, interoperable, and reliable way.
  • D. asynchronous communication method
    An asynchronous communication method is a way of exchanging information where messages are sent and received at different times, without requiring all participants to be simultaneously available.
  • E. distributed system
    A distributed system is a collection of independent computers that appear to users as a single coherent system by coordinating and communicating over a network to achieve common goals.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b34544be3c819084d1ab82d29f90c5 completed March 12, 2026, 10:59 p.m.
Created at: March 12, 2026, 11:07 p.m.