Triple

T4278839
Position Surface form Disambiguated ID Type / Status
Subject Oracle Real Application Clusters E97103 entity
Predicate instanceOf P0 FINISHED
Object fault tolerance solution C903 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: fault tolerance solution
Context triple: [Oracle Real Application Clusters, instanceOf, fault tolerance solution]
  • A. resolution
    Resolution is the process or outcome of resolving a problem, conflict, or ambiguity by reaching a clear, definitive, and often agreed-upon state or decision.
  • B. reserve component
    A reserve component is a supplementary part of a system or organization that remains available for use when primary resources are insufficient, unavailable, or require reinforcement.
  • C. raid
    A raid is a coordinated, often surprise incursion by a group into a target location or system with the primary goal of quickly achieving a specific objective and then withdrawing.
  • D. distributed system chosen
    A distributed system is a collection of independent computers that appear to users as a single coherent system by coordinating and communicating over a network to achieve common goals.
  • E. secure facility
    A secure facility is a controlled-access location designed with physical, technical, and procedural safeguards to protect people, assets, and sensitive information from unauthorized access or harm.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b34544be3c819084d1ab82d29f90c5 completed March 12, 2026, 10:59 p.m.
Created at: March 12, 2026, 11:07 p.m.