Triple

T4275553
Position Surface form Disambiguated ID Type / Status
Subject Combine E97040 entity
Predicate instanceOf P0 FINISHED
Object reactive programming framework C15473 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: reactive programming framework
Context triple: [Combine, instanceOf, reactive programming framework]
  • A. cross-platform development framework
    A cross-platform development framework is a software toolkit that enables developers to build applications that run on multiple operating systems or devices from a single shared codebase.
  • B. cross-platform UI framework
    A cross-platform UI framework is a software toolkit that enables developers to build user interfaces once and deploy them across multiple operating systems and devices with minimal platform-specific changes.
  • C. UI framework
    A UI framework is a collection of tools, libraries, and components that provide a structured way to build, style, and manage user interfaces for applications.
  • D. messaging framework
    A messaging framework is a structured system that defines how messages are formatted, transmitted, routed, and processed between distributed components or applications.
  • E. graphical user interface framework
    A graphical user interface framework is a collection of tools, libraries, and components that simplifies building, organizing, and managing interactive visual elements of software applications.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b34544be3c819084d1ab82d29f90c5 completed March 12, 2026, 10:59 p.m.
Created at: March 12, 2026, 11:07 p.m.