Triple

T4264347
Position Surface form Disambiguated ID Type / Status
Subject PSU South stations E96787 entity
Predicate instanceOf P0 FINISHED
Object light rail station complex C2851 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: light rail station complex
Context triple: [PSU South stations, instanceOf, light rail station complex]
  • A. light-rail station chosen
    A light-rail station is a designated facility where light-rail vehicles stop to allow passengers to board, alight, and transfer between services, typically featuring platforms, shelters, signage, and ticketing amenities.
  • B. rapid transit station
    A rapid transit station is a designated facility where passengers board, alight, and transfer between high-frequency urban rail or metro services, typically featuring platforms, ticketing areas, and access to surrounding streets or other transport modes.
  • C. light rail operations facility
    A light rail operations facility is a specialized complex where light rail vehicles are stored, maintained, dispatched, and managed to support safe and efficient transit service.
  • D. commuter rail station
    A commuter rail station is a designated facility where passengers board and alight regional trains that connect suburbs or outlying areas with urban centers, typically offering platforms, ticketing, and basic passenger amenities.
  • E. rapid transit depot
    A rapid transit depot is a specialized facility where urban rail vehicles are stored, inspected, maintained, and dispatched for service on a rapid transit network.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b34543f06c8190915ebb1a4574ffa9 completed March 12, 2026, 10:59 p.m.
Created at: March 12, 2026, 11:06 p.m.