Triple

T4258911
Position Surface form Disambiguated ID Type / Status
Subject Humboldt Parkway E96051 entity
Predicate hasSectionReplacedBy P29646 FINISHED
Object Kensington Expressway
The Kensington Expressway is a major urban highway in Buffalo, New York, constructed in the mid-20th century and widely criticized for its disruptive impact on surrounding neighborhoods and historic parkway landscapes.
E423205 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kensington Expressway | Statement: [Humboldt Parkway, hasSectionReplacedBy, Kensington Expressway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kensington Expressway
Context triple: [Humboldt Parkway, hasSectionReplacedBy, Kensington Expressway]
  • A. Macdonald–Cartier Freeway
    The Macdonald–Cartier Freeway is a major Canadian highway corridor in Ontario that serves as one of the busiest and most important transportation routes in the country.
  • B. Gardiner Expressway
    The Gardiner Expressway is a major elevated highway running along Toronto’s waterfront, serving as a key east–west commuter route into and out of the city’s downtown core.
  • C. E.C. Row Expressway
    The E.C. Row Expressway is a major east–west freeway in Windsor, Ontario, serving as a primary urban arterial route across the city.
  • D. Clearview Expressway
    Clearview Expressway is a major north–south highway in Queens, New York City, that links residential neighborhoods to key regional routes and crossings.
  • E. Don Valley Parkway
    Don Valley Parkway is a major controlled-access expressway in Toronto, Ontario, running along the Don River and connecting the city's downtown core with its northeastern suburbs.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Kensington Expressway
Triple: [Humboldt Parkway, hasSectionReplacedBy, Kensington Expressway]
Generated description
The Kensington Expressway is a major urban highway in Buffalo, New York, constructed in the mid-20th century and widely criticized for its disruptive impact on surrounding neighborhoods and historic parkway landscapes.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Kensington Expressway
Target entity description: The Kensington Expressway is a major urban highway in Buffalo, New York, constructed in the mid-20th century and widely criticized for its disruptive impact on surrounding neighborhoods and historic parkway landscapes.
  • A. Macdonald–Cartier Freeway
    The Macdonald–Cartier Freeway is a major Canadian highway corridor in Ontario that serves as one of the busiest and most important transportation routes in the country.
  • B. Gardiner Expressway
    The Gardiner Expressway is a major elevated highway running along Toronto’s waterfront, serving as a key east–west commuter route into and out of the city’s downtown core.
  • C. E.C. Row Expressway
    The E.C. Row Expressway is a major east–west freeway in Windsor, Ontario, serving as a primary urban arterial route across the city.
  • D. Clearview Expressway
    Clearview Expressway is a major north–south highway in Queens, New York City, that links residential neighborhoods to key regional routes and crossings.
  • E. Don Valley Parkway
    Don Valley Parkway is a major controlled-access expressway in Toronto, Ontario, running along the Don River and connecting the city's downtown core with its northeastern suburbs.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasSectionReplacedBy
Context triple: [Humboldt Parkway, hasSectionReplacedBy, Kensington Expressway]
  • A. hasReplaced
    Indicates that one entity has taken the place or function of another entity, superseding it in a given context.
  • B. seeksToReplace
    Indicates an intention or effort by one entity to take over the role, function, or position currently held by another entity.
  • C. replacedWith chosen
    Indicates that one entity has been substituted or superseded by another entity, taking over its role, function, or position.
  • D. placedBy
    Indicates that one entity was positioned, set, or put in a location or context by another entity.
  • E. mayBeReplacedBy
    Indicates that one entity can potentially be substituted or superseded by another entity.
  • F. None of above.

Provenance (6 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69b3454095ac81909c2494f7ff294af1 completed March 12, 2026, 10:59 p.m.
NER Named-entity recognition batch_69b34f7ec4508190a5067f1112ac7dca completed March 12, 2026, 11:42 p.m.
NED1 Entity disambiguation (via context triple) batch_69b5a88e62588190930dd3a1c9ae200e completed March 14, 2026, 6:27 p.m.
NEDg Description generation batch_69b5a8e0f3f88190a010b01ac5c8d3a2 completed March 14, 2026, 6:28 p.m.
NED2 Entity disambiguation (via description) batch_69b5a93f85148190ae8ee55715415e8a completed March 14, 2026, 6:30 p.m.
PD Predicate disambiguation batch_69b347f73e008190a908a48ef389945a completed March 12, 2026, 11:10 p.m.
Created at: March 12, 2026, 11:06 p.m.