Triple

T4199035
Position Surface form Disambiguated ID Type / Status
Subject Scone E86021 entity
Predicate locatedOn P40 FINISHED
Object New England Highway E71057 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: New England Highway | Statement: [Scone, locatedOn, New England Highway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: New England Highway
Context triple: [Scone, locatedOn, New England Highway]
  • A. New England Highway chosen
    The New England Highway is a major inland highway in eastern Australia that links New South Wales and Queensland, serving as a key transport route through the New England region.
  • B. Mitchell Highway
    The Mitchell Highway is a major rural highway in New South Wales and Queensland, Australia, linking inland regional centres and serving as a key transport route across the central west of the country.
  • C. Bass Highway
    Bass Highway is a major arterial road in Tasmania, Australia, linking key coastal towns and cities including Burnie.
  • D. Glenn Highway
    Glenn Highway is a primary roadway in Alaska that connects the city of Anchorage with interior regions of the state, serving as a key transportation corridor.
  • E. Shirley Highway
    Shirley Highway is a major freeway in Northern Virginia that forms part of the primary commuter route between the suburbs and Washington, D.C.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed93b89f48190a31f6d57c760e42f completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69af036243b4819097efe6b796823cd9 completed March 9, 2026, 5:29 p.m.
NED1 Entity disambiguation (via context triple) batch_69bf832772d08190842b1e1c1a87ea3a completed March 22, 2026, 5:50 a.m.
Created at: March 9, 2026, 3:48 p.m.