Triple

T419855
Position Surface form Disambiguated ID Type / Status
Subject Port of Coquimbo E8076 entity
Predicate instanceOf P0 FINISHED
Object port C452 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: port
Context triple: [Port of Coquimbo, instanceOf, port]
  • A. seaport chosen
    A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
  • B. gateway
    A gateway is a conceptual class that represents a controlled entry and exit point between different systems, networks, or domains, managing and regulating the flow of data, requests, or entities across boundaries.
  • C. harbor
    A harbor is a sheltered body of water, often equipped with docks and facilities, where ships can anchor safely for loading, unloading, and protection from rough seas.
  • D. pond
    A pond is a small, often still body of water, natural or artificial, that supports aquatic life and reflects its surrounding environment.
  • E. public square
    A public square is an open, communal urban space where people gather for social interaction, events, commerce, and civic activities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e7f1d1bc81909cf2dc9754a3c334 completed Feb. 28, 2026, 1:04 p.m.
Created at: Feb. 28, 2026, 1:11 p.m.