Triple

T4189756
Position Surface form Disambiguated ID Type / Status
Subject JE Dunn Construction E89004 entity
Predicate instanceOf P0 FINISHED
Object general contractor C11460 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: general contractor
Context triple: [JE Dunn Construction, instanceOf, general contractor]
  • A. construction management firm chosen
    A construction management firm is a professional organization that plans, coordinates, and oversees construction projects from inception to completion, ensuring they are delivered on time, within budget, and to specified quality and safety standards.
  • B. construction and trading company
    A construction and trading company is a business entity that both executes building and infrastructure projects and engages in the procurement, sale, and distribution of construction-related materials, equipment, or goods.
  • C. organ building firm
    An organ building firm is a specialized company that designs, constructs, restores, and maintains pipe organs for churches, concert halls, and other venues.
  • D. architect
    An architect is a professional who plans, designs, and oversees the construction of buildings and other structures, balancing functionality, safety, aesthetics, and client needs.
  • E. construction industry partnership
    A construction industry partnership is a collaborative alliance between contractors, suppliers, designers, and other stakeholders formed to jointly plan, finance, and deliver construction projects more efficiently and profitably.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed9569a4481908b6c1fcec2a11e21 completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:46 p.m.