Triple

T4183255
Position Surface form Disambiguated ID Type / Status
Subject Lübars E88245 entity
Predicate instanceOf P0 FINISHED
Object village-like settlement C14799 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: village-like settlement
Context triple: [Lübars, instanceOf, village-like settlement]
  • A. former village
    A former village is a once-inhabited settlement that has lost its status or population as a village, often due to abandonment, depopulation, or administrative reclassification.
  • B. oasis settlement
    An oasis settlement is a community established around a natural water source in an otherwise arid or desert region, relying on the oasis for agriculture, trade, and habitation.
  • C. rural town
    A rural town is a small, sparsely populated community situated in the countryside, typically characterized by close-knit social ties, limited infrastructure, and an economy often based on agriculture or local resource industries.
  • D. village center
    A village center is the focal area of a rural community where key social, commercial, and civic activities are concentrated, often including shops, public spaces, and community facilities.
  • E. coastal settlement
    A coastal settlement is a community established along a sea or ocean shoreline, whose location, economy, and culture are strongly influenced by the adjacent marine environment.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed9477e8c81908bcb862d2db55b1d completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:45 p.m.