Triple

T4176192
Position Surface form Disambiguated ID Type / Status
Subject Philips Park, Manchester E86482 entity
Predicate instanceOf P0 FINISHED
Object Victorian-era park C218 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Victorian-era park
Context triple: [Philips Park, Manchester, instanceOf, Victorian-era park]
  • A. Royal Park
    A Royal Park is a large, formally designated public green space historically associated with a monarchy, preserved for recreation, leisure, and ceremonial or cultural events.
  • B. Olympic Park
    Olympic Park is a large, purpose-built sports and recreation complex that hosts Olympic events and later serves as a public venue for athletics, leisure, and cultural activities.
  • C. Victorian building
    A Victorian building is a structure constructed or styled during the reign of Queen Victoria (1837–1901), typically characterized by ornate detailing, eclectic revivalist elements, asymmetrical forms, and rich decorative features such as bay windows, gables, and elaborate trim.
  • D. component of Down House grounds
    A component of Down House grounds is any distinct physical or landscaped feature—such as gardens, paths, buildings, or natural areas—that forms part of the overall estate surrounding Down House.
  • E. urban park chosen
    An urban park is a publicly accessible green space within a city that provides recreational areas, natural scenery, and social gathering places for residents and visitors.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed93de98c8190ad838ce507b77c8a completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:45 p.m.