Triple

T4150819
Position Surface form Disambiguated ID Type / Status
Subject Brickell Metrorail station E89898 entity
Predicate hasConnection P8776 FINISHED
Object Miami Metromover E79311 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Miami Metromover | Statement: [Brickell Metrorail station, hasConnection, Miami Metromover]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Miami Metromover
Context triple: [Brickell Metrorail station, hasConnection, Miami Metromover]
  • A. Metrorail
    Metrorail is Miami-Dade County’s elevated rapid transit system that connects key neighborhoods, suburbs, and downtown Miami.
  • B. Metrorail
    Metrorail is the rapid transit system serving the Washington, D.C. metropolitan area, operated by the Washington Metropolitan Area Transit Authority (WMATA).
  • C. Metromover chosen
    Metromover is a free, automated people mover system in Miami that operates elevated trains to connect key areas of the city’s urban core.
  • D. Santo Domingo Metro
    Santo Domingo Metro is a rapid transit system serving the metropolitan area of Santo Domingo, providing high-capacity urban rail transportation across the capital of the Dominican Republic.
  • E. Metro Rapid
    Metro Rapid is a network of limited-stop, high-frequency bus routes in Los Angeles designed to provide faster service along major corridors than regular local buses.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed95a59a881909b26e70b42c6811a completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69af0274f440819087dd58a9ce45cce5 completed March 9, 2026, 5:25 p.m.
NED1 Entity disambiguation (via context triple) batch_69b5960e8e3c8190b8eb9ed59971aa63 completed March 14, 2026, 5:08 p.m.
Created at: March 9, 2026, 3:43 p.m.