Triple
T4149971
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Magarpatta |
E89879
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | planned township |
C5974
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: planned township Context triple: [Magarpatta, instanceOf, planned township]
-
A.
planned residential community
chosen
A planned residential community is a deliberately designed neighborhood or development where housing, infrastructure, amenities, and land use are pre-organized to create a cohesive living environment.
-
B.
planned city
A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
-
C.
civil township
A civil township is a local unit of government, typically a subdivision of a county, that provides administrative and public services to residents in rural or semi-rural areas.
-
D.
planning district
A planning district is a defined geographic area used by governments or organizations to coordinate land use, infrastructure, and development policies.
-
E.
rural town
A rural town is a small, sparsely populated community situated in the countryside, typically characterized by close-knit social ties, limited infrastructure, and an economy often based on agriculture or local resource industries.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed95a59a881909b26e70b42c6811a |
completed | March 9, 2026, 2:29 p.m. |
Created at: March 9, 2026, 3:43 p.m.