Triple
T4145219
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | EDVAC |
E89365
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | stored-program computer |
C15027
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: stored-program computer Context triple: [EDVAC, instanceOf, stored-program computer]
-
A.
mechanical computer
A mechanical computer is a device that performs calculations or processes information using purely mechanical components such as gears, levers, and cams instead of electronic circuits.
-
B.
CMOS microprocessor
A CMOS microprocessor is a central processing unit implemented using complementary metal-oxide-semiconductor technology, providing high integration, low power consumption, and reliable digital computation on a single chip.
-
C.
model of computation
A model of computation is an abstract mathematical framework that defines how algorithms are represented and executed, specifying the rules, operations, and resources available for performing computations.
-
D.
RISC architecture
A RISC architecture is a computer processor design that uses a small, highly optimized set of simple instructions to achieve high performance through efficient pipelining and parallelism.
-
E.
microprocessor
A microprocessor is a compact, integrated circuit that performs the arithmetic, logic, control, and input/output operations of a computer’s central processing unit (CPU) on a single chip.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed95785788190ae75bcf0cd1cafdf |
completed | March 9, 2026, 2:29 p.m. |
Created at: March 9, 2026, 3:43 p.m.