Triple

T4144070
Position Surface form Disambiguated ID Type / Status
Subject Tisa riverbank E89341 entity
Predicate instanceOf P0 FINISHED
Object riverbank C8388 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: riverbank
Context triple: [Tisa riverbank, instanceOf, riverbank]
  • A. river bank chosen
    A river bank is the sloping land alongside a river that confines its water flow and shapes its course.
  • B. river
    A river is a natural flowing body of water, usually freshwater, that moves continuously along a defined channel from higher elevations toward lower ones, often emptying into a sea, lake, or another river.
  • C. river corridor
    A river corridor is the linear landscape surrounding a river, including its channel, banks, floodplain, and adjacent habitats, through which water, sediment, organisms, and energy flow and interact.
  • D. river gorge
    A river gorge is a deep, narrow valley with steep, often rocky walls carved over time by the persistent erosive action of a river.
  • E. river basin
    A river basin is the land area drained by a river and all its tributaries, bounded by topographic divides that separate it from adjacent basins.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed95785788190ae75bcf0cd1cafdf completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:43 p.m.