Triple

T4141128
Position Surface form Disambiguated ID Type / Status
Subject Optus Stadium E89272 entity
Predicate architect P184 FINISHED
Object Cox Architecture E300694 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Cox Architecture | Statement: [Optus Stadium, architect, Cox Architecture]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Cox Architecture
Context triple: [Optus Stadium, architect, Cox Architecture]
  • A. Cox Architecture chosen
    Cox Architecture is an Australian architectural firm renowned for designing major public and sports facilities, including prominent stadiums and civic buildings.
  • B. Googie architecture
    Googie architecture is a futuristic, mid-20th-century architectural style characterized by bold angles, sweeping curves, and space-age motifs inspired by car culture, jets, and the Atomic Age.
  • C. Allied Architects
    Allied Architects was a collaborative group of Los Angeles-based architects best known for designing the iconic open-air Hollywood Bowl amphitheater.
  • D. Allied Works Architecture
    Allied Works Architecture is a contemporary American architecture and design firm known for its innovative cultural, institutional, and civic projects.
  • E. Cookfox Architects
    Cookfox Architects is a New York–based architecture firm known for its sustainable, high-performance building designs and leadership in green urban development.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed95785788190ae75bcf0cd1cafdf completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69af024b8fe4819098e8f393474363c8 completed March 9, 2026, 5:24 p.m.
NED1 Entity disambiguation (via context triple) batch_69b576cff6c881909134804ba6f9876d completed March 14, 2026, 2:55 p.m.
Created at: March 9, 2026, 3:43 p.m.