Triple
T4136942
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Queen Red |
E85176
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Sword Beach sub-sector |
C341
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Sword Beach sub-sector Context triple: [Queen Red, instanceOf, Sword Beach sub-sector]
-
A.
amphibious invasion
chosen
An amphibious invasion is a coordinated military operation in which armed forces assault a hostile or potentially hostile shore by deploying troops, vehicles, and equipment from the sea onto land.
-
B.
barrier beach
A barrier beach is a long, narrow, offshore deposit of sand or sediment that runs parallel to the coastline, protecting the shore from waves and storms while creating sheltered waters behind it.
-
C.
arm of the Red Sea
An arm of the Red Sea is a long, narrow extension of the main Red Sea body that penetrates into adjacent landmasses, often forming distinct gulfs or inlets such as the Gulf of Suez or the Gulf of Aqaba.
-
D.
naval infantry
Naval infantry are specialized military forces trained and equipped to conduct amphibious assaults and other combat operations from the sea onto hostile or potentially hostile shores.
-
E.
Moor
A Moor is a broad, open expanse of uncultivated land, often high and poorly drained, characterized by heather, peat bogs, and sparse vegetation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed935ccd881909dc61f81bcdb7a78 |
completed | March 9, 2026, 2:29 p.m. |
Created at: March 9, 2026, 3:43 p.m.